Ply, MW, rep 1
Plywood
Description
This experiment is on a system consisting of a Plywood cladding panel and a Mineral Wool (MW) insulation panel, separated with a cavity of 50 mm width. It is the first repetition of this system configuration.
Experiment Notes
At approximately 6 minutes the plywood panel began to touch the insulation panel, affecting the mass measurements. At approximately 8 minutes the plywood panel began to collapse, causing a sudden change in the mass measurements as debris fell into the debris tray, onto both load cells, or off the entire assembly.
Test Details
| Cladding | Plywood |
| Cladding Thickness [mm] | 12 |
| Insulation | Mineral Wool (MW) |
| Insulation thickness [mm] | 100 |
| Cavity width [mm] | 50 |
| Repetition number | 1 |
Metrics
| Peak HRR [kW] | 148 |
| Time to Peak HRR [mins] | 6.23 |
| Total HR [MJ] | 60.4 |
| Peak dQ/dt [kW/s] | 1.25 |
| Time to Peak dQ/dt [mins] | 4.77 |
| Residual HRR [kW] | 4.21 |