This experiment is on a system consisting of a Plywood cladding panel and a Mineral Wool (MW) insulation panel, separated with a cavity of 50 mm width. It is the third repetition of this system configuration.

Experiment Notes

At approximately 6 minutes the plywood panel began to touch the insulation panel, affecting the mass measurements. At approximately 7 minutes the plywood panel began to collapse, causing a sudden change in the mass measurements as debris fell into the debris tray, onto both load cells, or off the entire assembly.

Test Details
Cladding Plywood
Cladding Thickness [mm] 12
Insulation Mineral Wool (MW)
Insulation thickness [mm] 100
Cavity width [mm] 50
Repetition number 3
Metrics
Peak HRR [kW] 171
Time to Peak HRR [mins] 6.98
Total HR [MJ] 60.7
Peak dQ/dt [kW/s] 1.49
Time to Peak dQ/dt [mins] 5
Residual HRR [kW] 4.56
Test Pictures (click to zoom)
Download Data (CSV) Download Data (PDF)
Video
HRR [kW] including burner baseline
Minutes