AL, PIR, rep 3

Aluminium

Description

This experiment is on a system consisting of an Aluminium cladding panel and a Polyisocyanurate (PIR) foam insulation panel, separated with a cavity of 50 mm width. It is the third repetition of this system configuration.

Experiment Notes

At approximately 7 minutes the aluminium panel began to touch the insulation panel, affecting the mass measurements.

Test Details
Cladding Aluminium
Cladding Thickness [mm] 2
Insulation Polyisocyanurate (PIR) foam
Insulation thickness [mm] 100
Cavity width [mm] 50
Repetition number 3
Metrics
Peak HRR [kW] 4.48
Time to Peak HRR [mins] 0.52
Total HR [MJ] 0.122
Peak dQ/dt [kW/s] 0.155
Time to Peak dQ/dt [mins] 1
Residual HRR [kW] 1.76
Test Pictures (click to zoom)
Download Data (CSV) Download Data (PDF)